XiTRACK™ Projects:  Kingussie Bridges

Two bridges on the Highland Main Line at Gynack and Balavil near Kingussie are prone to flooding causing heavy ballast contamination and potential wash-out, leading to track defects, disruption and subsequent delays.

A XiTRACK scheme was devised for each of the bridge transitions to help prevent ballast being washed out under the sleepers during such periods of flooding. This gives protection to the ballast under the sleepers permitting any water to pass through the GeoComposite but allows all forms of conventional maintenance to occur.

The XiTRACK Polymer was applied in ambient conditions of -9oC, this being the lowest application temperature to date, but the material behaved as expected. The jobs were completed on time and each site now has proven enhanced protection against ballast wash-out.

 

 

Syston

Knighton

Keadby

Kingussie Bridges

Falkirk High Tunnel

Tottenham South Junction

Purfleet Crossing

Bletchley

Harford

Worplesdon

WCML