|
|
TYPICAL TREATMENT SITES Transitions (Bridge, Tunnel, Slab) Joints (IBJ, ES) Switches, Crossings & Diamonds Curve Stabilisation Failed Track Sub-Structures Weak & Variable Formations Level Crossing Stabilisation Reduced Ballast Depths (Including Masonry Bridges) Tunnel GeoComposites Track Services (UTX) Ballast Bridge Decks (High Speed) Tolerance Issues (e.g. Tunnels) Ballast Flooding Protection Sleeper End-Plate Replacement
|