XiTRACK Process  | XiTRACK Procedure  | XiTRACK Removal  | Typical Sites | Video 

TYPICAL TREATMENT SITES 

Transitions (Bridge, Tunnel, Slab)
Joints (IBJ, ES)
Switches, Crossings & Diamonds
Curve Stabilisation
Failed Track Sub-Structures 
Weak & Variable Formations
Level Crossing Stabilisation
Reduced Ballast Depths (Including Masonry Bridges)
Tunnel GeoComposites
Track Services (UTX)
Ballast Bridge Decks (High Speed)
Tolerance Issues (e.g. Tunnels)
Ballast Flooding Protection
Sleeper End-Plate Replacement